Acceptance Testing
Overview
Acceptance testing verifies that the eRT software has been correctly installed and is functioning as intended within the Licensee’s computing environment prior to clinical commissioning or use. Acceptance testing confirms proper operation of core application functions using manufacturer-supplied reference data and expected results.
Manufacturer-Supplied Test Materials
The following datasets will be used for acceptance testing.
These materials are intended solely for verification of system functionality and shall not be used for clinical purposes.
Acceptance Testing Procedure
Install the eRT software according to the Installation Instructions

Link.
Login to the eRT software as a user with Organization Configuration permissions, then import the provided Reference Organization Configuration.
Import the provided Phantom Patient Dataset
Create the Acceptance Test Treatment Plan as defined in the provided Test Plan Definition
Verify successful completion of the following operations by comparing to the provided Acceptance Test Results:
Import of imaging and associated data without errors.
Correct display of image orientation and geometry.
Visualization of structures consistent with provided documentation.
Execution of dose calculation using default settings.
Display of calculated dose distribution.
Export of test data using supported interfaces.
Compare system outputs with the provided reference results, including:
visual comparison of geometry and overlays;
confirmation of calculated numerical values where specified;
confirmation that no calculation or system errors occur.
Acceptance Criteria
Acceptance testing is successful when:
all required operations complete without system errors;
calculated and displayed results are consistent with manufacturer-provided reference outcomes within stated tolerances;
application functionality operates as described in the documentation.
During Acceptance Testing, the user shall document, at a minimum:
Failure Handling
If acceptance criteria are not met, the eRT software shall not be used clinically until discrepancies are resolved in consultation with the manufacturer.
Relationship to Commissioning
Successful completion of Acceptance Testing shall be confirmed prior to performing clinical commissioning procedures.
Repetition of Acceptance Testing
Acceptance testing should be repeated following:
installation on new hardware,
operating system changes,
major Software upgrades,
restoration from system backup.
Verifying Data Transfer Accuracy
In addition to the calculation acceptance testing, the QMP shall verify the accuracy and completeness of data transferred between the eRT software and external systems prior to clinical use. This procedure confirms correct configuration of data exchange interfaces and helps ensure treatment information integrity.
Scope
This verification applies to all supported data exchange interfaces, including but not limited to:
Verification Procedure
Import representative datasets from each connected external system, that include a CT image set with corresponding structure set
Confirm the following after import:
patient identifiers match the source system
image orientation and spatial alignment are correct
structure geometry and labeling are preserved
referenced coordinate systems are consistent
Export data generated by the eRT software to the receiving system
Verify in the receiving system that:
geometry and positioning remain unchanged
dose distributions align with source images
plan parameters are transferred without unintended modification
Recommended Checks
Verification should include (at a minimum):
visual overlay comparison
coordinate consistency checks
confirmation of Frame of Reference alignment
verification of referenced object relationships
Acceptance & Documentation
Acceptance criteria shall be defined by the clinical institution based on applicable professional guidelines and institutional procedures.
The user shall document successful verification for each connected system prior to clinical deployment.
Reverification
Data transfer verification should be repeated following:
Acceptance Testing Sign-Off
After completion of acceptance testing, the Qualified Medical Physicist will sign off on the Acceptance Test Form indicating that this step has been satisfactorily completed.