User Tools

Site Tools


electronrt:userguide:tutorials:plan_approval

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
electronrt:userguide:tutorials:plan_approval [2020/08/13 22:11] – [Approving a plan] cmontoyaelectronrt:userguide:tutorials:plan_approval [2022/04/22 13:40] (current) dpatenaude
Line 1: Line 1:
 ====== Plan Approval ====== ====== Plan Approval ======
-Before users are able to order blocks or boluses in the ElectronRT app the plans for those parts but be approved by a user with physician permissions. This action ensures parts are not ordered for plans that have not been properly QA'ed. 
  
 +Plan Approval is a mechanism whereby users can "lock" a plan to prevent further edits or changes once it has been reviewed by a qualified radiation therapy professional (typically a licensed Radiation Oncologist). It should also be noted that before users are able to order blocks or boluses in the ElectronRT app, the plan for those parts must be approved by a user with the [[electronrt:instructions_for_use:instructions_for_use#account_permissions|'Plan Approval' permission]]. This action ensures parts are not ordered for plans that have not been properly reviewed.
 +
 +Approved plans differ from unapproved plans in the following ways:
 +  - They are read only and no treatment plan data can be changed
 +  - The plan dose and hardware devices are no longer being recomputed in the UI as during approval those items are saved to the patient disk storage to ensure they never change from how they were viewed at the time of approval.
 +  - The Ordering and Plan QA blocks are enabled
 +Note, Plans can not be unapproved.
  
 <imgcaption approval_1|Plan selection with no approvals>{{ :electronrt:userguide:tutorials:decimal_electronrt_plan_approval_plans.png?direct&400 |}}</imgcaption> <imgcaption approval_1|Plan selection with no approvals>{{ :electronrt:userguide:tutorials:decimal_electronrt_plan_approval_plans.png?direct&400 |}}</imgcaption>
  
-When a user goes to select a plan for a course for their patient they will be able to tell if the plan is approved or not plans that are green are approved while not approved plans are the standard blue. Approved plans also state the time they were approved and by which user in order to maintain integrity with the plan.+When a user goes to select a plan for a course for their patientthey will be able to tell if the plan is approved or not. Plans that are green are approved while unapproved plans are the standard blue. Approved plans also state the time they were approved and by which user in order to maintain integrity with the plan.
  
 <imgcaption approval_2|Plan selection with an approved plan>{{ :electronrt:userguide:tutorials:decimal_electronrt_plan_approval_approved_plan.png?direct&400 |}}</imgcaption> <imgcaption approval_2|Plan selection with an approved plan>{{ :electronrt:userguide:tutorials:decimal_electronrt_plan_approval_approved_plan.png?direct&400 |}}</imgcaption>
Line 11: Line 17:
 ===== Approving a plan ===== ===== Approving a plan =====
  
-In order to approve a plan a user must simply open the plan they wish to approve and select the "Approve" option inside the general block.+In order to approve a plan a user must simply open the plan they wish to approve and select the "Approve" option inside the General Block.
  
 NOTE: The option will not appear in the following situations: NOTE: The option will not appear in the following situations:
   * The user does not have permission to approve plans    * The user does not have permission to approve plans 
-  * The plan has no valid beamsor there are un-handled errors with the existing beams+  * The plan has no valid beams or there are un-handled errors with the existing beams
   * The plan does not have valid dose   * The plan does not have valid dose
 In any of these cases the general block will look as such: In any of these cases the general block will look as such:
Line 29: Line 35:
 <imgcaption approval_5|Import Directory Input>{{ :electronrt:userguide:tutorials:decimal_electronrt_plan_approval_confirmation.png?direct&400 |}}</imgcaption> <imgcaption approval_5|Import Directory Input>{{ :electronrt:userguide:tutorials:decimal_electronrt_plan_approval_confirmation.png?direct&400 |}}</imgcaption>
  
-When that is completed all users on this environment should see the plan as approved. +When that is completed all users on this environment should see the plan as approved (see Figure 2).
- +
-<imgcaption approval_2|Plan selection with an approved plan>{{ :electronrt:userguide:tutorials:decimal_electronrt_plan_approval_approved_plan.png?direct&400 |}}</imgcaption> +
  
  
electronrt/userguide/tutorials/plan_approval.1597356667.txt.gz · Last modified: (external edit)