electronrt:userguide:tutorials:plan_approval
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
electronrt:userguide:tutorials:plan_approval [2020/08/19 12:05] – dpatenaude | electronrt:userguide:tutorials:plan_approval [2022/04/22 13:40] (current) – dpatenaude | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Plan Approval ====== | ====== Plan Approval ====== | ||
- | Before | + | |
+ | Plan Approval is a mechanism whereby users can " | ||
Approved plans differ from unapproved plans in the following ways: | Approved plans differ from unapproved plans in the following ways: | ||
- They are read only and no treatment plan data can be changed | - They are read only and no treatment plan data can be changed | ||
- | - The plan dose and hardware devices are no longer being recomputed in the UI. On approval those items are saved to the patient disk storage to ensure they never change from how they were viewed at the time of approval | + | - The plan dose and hardware devices are no longer being recomputed in the UI as during |
- The Ordering and Plan QA blocks are enabled | - The Ordering and Plan QA blocks are enabled | ||
- | - Plans can not be unapproved | + | Note, Plans can not be unapproved. |
< | < | ||
Line 16: | Line 17: | ||
===== Approving a plan ===== | ===== Approving a plan ===== | ||
- | In order to approve a plan a user must simply open the plan they wish to approve and select the " | + | In order to approve a plan a user must simply open the plan they wish to approve and select the " |
NOTE: The option will not appear in the following situations: | NOTE: The option will not appear in the following situations: | ||
* The user does not have permission to approve plans | * The user does not have permission to approve plans | ||
- | * The plan has no valid beams/ or there are un-handled errors with the existing beams | + | * The plan has no valid beams or there are un-handled errors with the existing beams |
* The plan does not have valid dose | * The plan does not have valid dose | ||
In any of these cases the general block will look as such: | In any of these cases the general block will look as such: | ||
Line 34: | Line 35: | ||
< | < | ||
- | When that is completed all users on this environment should see the plan as approved. | + | When that is completed all users on this environment should see the plan as approved |
- | + | ||
- | < | + | |
electronrt/userguide/tutorials/plan_approval.1597838710.txt.gz · Last modified: (external edit)