User Tools

Site Tools


electronrt:userguide:tutorials:plan_approval

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
electronrt:userguide:tutorials:plan_approval [2021/07/29 18:28] – external edit 127.0.0.1electronrt:userguide:tutorials:plan_approval [2022/04/22 13:40] (current) dpatenaude
Line 1: Line 1:
 ====== Plan Approval ====== ====== Plan Approval ======
  
-Plan Approval is a mechanism whereby users can "lock" a plan to prevent further edits or changes once it has been reviewed by a qualified radiation therapy professional (typically a licensed Radiation Oncologist). It should also be noted that before users are able to order blocks or boluses in the ElectronRT app, the plan for those parts must be approved by a user with physics permissions. This action ensures parts are not ordered for plans that have not been properly reviewed.+Plan Approval is a mechanism whereby users can "lock" a plan to prevent further edits or changes once it has been reviewed by a qualified radiation therapy professional (typically a licensed Radiation Oncologist). It should also be noted that before users are able to order blocks or boluses in the ElectronRT app, the plan for those parts must be approved by a user with the [[electronrt:instructions_for_use:instructions_for_use#account_permissions|'Plan Approval' permission]]. This action ensures parts are not ordered for plans that have not been properly reviewed.
  
 Approved plans differ from unapproved plans in the following ways: Approved plans differ from unapproved plans in the following ways:
electronrt/userguide/tutorials/plan_approval.1627583287.txt.gz · Last modified: by 127.0.0.1