planning:userguide:tutorials:optimization_constraints
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
planning:userguide:tutorials:optimization_constraints [2017/02/15 21:37] – [About Constraints] kerhart | planning:userguide:tutorials:optimization_constraints [2021/07/29 18:28] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | <WRAP center round important 60%> | ||
+ | This page is deprecated and now included in the [[planning: | ||
+ | </ | ||
+ | |||
+ | |||
+ | |||
====== Optimization Constraints ====== | ====== Optimization Constraints ====== | ||
===== About Constraints ===== | ===== About Constraints ===== | ||
- | // | + | // |
It should be noted that all constraints are considered "hard limits" | It should be noted that all constraints are considered "hard limits" | ||
Line 18: | Line 24: | ||
===== Working with Constraints ===== | ===== Working with Constraints ===== | ||
- | ==== Working with Fraction Group Constraints ==== | + | ==== Working with Fraction Group and Target/Beam Set Constraints ==== |
- | // | + | |
- | // | + | |
- | - Select the //Fraction Group// if it has been created or create a new by selecting | + | // |
- | - Choose the target, the phase and number of fractions to be treated | + | |
- | - Choose | + | - Select the //Fraction Group// if it has been created or create a new one by clicking |
- | - Define what constraint(s) should be applied to each structure by choosing the constraint | + | - Choose the prescription, number of fractions to be treated |
- | - Once the constraints are set in the //Fraction Group// the user will create | + | - Choose the type of treatment |
- | - The assigned constraint doses will be divided evenly among the //Beam Sets// in the // | + | - Choose |
+ | - Choose | ||
+ | - Assign the dose constraints to the //Target// | ||
+ | - The assigned constraint doses at this level will be divided evenly among the //Beams// to the //Target//, which allows for quick creation of SFO treatments | ||
==== Working with Plan Constraints ==== | ==== Working with Plan Constraints ==== | ||
// | // | ||
- | - Open the //Constraint// sub block contained in the //Plan Constraints/ | + | - Open the //Constraints// sub block contained in the // |
- | - Choose from the drop down the structure or structures to which constraints should be added {{ : | + | - Choose from the drop down the structure or structures to which constraints should be added |
- | - Define what constraint(s) should be applied to each structure by choosing the constraint and entering the dose {{ : | + | - Define what constraint(s) should be applied to each structure by choosing the constraint and entering the dose |
- | - Follow this and enter the constraints for all applicable structures. {{ : | + | - Follow this and enter the constraints for all applicable structures. {{ : |
- When finished click the //OK// button. | - When finished click the //OK// button. | ||
- | - Once all the Constraints have been set the user can either start the Feasibility or move on to defining the Objectives | + | - Once all the Constraints have been set the user can either start the Feasibility |
planning/userguide/tutorials/optimization_constraints.1487194627.txt.gz · Last modified: 2021/07/29 18:24 (external edit)