User Tools

Site Tools


planning:userguide:walkthroughs:prostate_plan

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

planning:userguide:walkthroughs:prostate_plan [2018/08/16 18:26] mhendersonplanning:userguide:walkthroughs:prostate_plan [2021/07/29 18:28] (current) – external edit 127.0.0.1
Line 29: Line 29:
 Prescription information is stored in the //Course// and must be added prior to making a treatment plan for a new patient. Prescription information is stored in the //Course// and must be added prior to making a treatment plan for a new patient.
  
-  - The patient opens directly after importing +  - Open the patient after importing the CT and Structure Set 
 +  - Open the Patient Course (note: it will automatically open if the patient is freshly created)
   - Next proceed to //Prescriptions//   - Next proceed to //Prescriptions//
     - Select //Create New Prescription//{{ :planning:userguide:walkthroughs:pro_create_new_rx.png?400 |}}     - Select //Create New Prescription//{{ :planning:userguide:walkthroughs:pro_create_new_rx.png?400 |}}
Line 142: Line 143:
         - Add a min dose constraint of 79.2 Gy (1.8 Gy per fx)         - Add a min dose constraint of 79.2 Gy (1.8 Gy per fx)
         - Add a max dose constraint of 85.5 Gy          - Add a max dose constraint of 85.5 Gy 
-      - At this point your //Fraction Group// should appear as shown below {{ :planning:userguide:walkthroughs:walkthrough_prostate_fg_complete.png?300 |}}+      - At this point your //Fraction Group// should appear as shown below {{ :planning:userguide:walkthroughs:walkthrough_prostate_fg_complete.png?400 |}}
       - Click //Done// to complete the //Fraction Group//       - Click //Done// to complete the //Fraction Group//
  
  
 === Constraints and Feasibility === === Constraints and Feasibility ===
-    - This is our only Fraction Group for this plan, so we'll move on to the plan level constraints and feasibility 
     - Open the //Constraints / Feasibility// sub-block      - Open the //Constraints / Feasibility// sub-block 
-      - First we'll enter the //Constraints// for the planning (target) volumes and a global maximum constraint +      - First we will enter the //Constraints// for the planning (target) volumes and a global maximum constraint 
-        - Remember these are the "hard stops/non negotiables" for the plan +        - For this example do the following:
-        - These doses will be decided per the users' department protocols +
-        - For this case do the following:+
           - Click the //Edit// button           - Click the //Edit// button
           - Click //Add Structure// and select (Skin)           - Click //Add Structure// and select (Skin)
             - Add a max set to 85.5             - Add a max set to 85.5
           - Click the //OK// button           - Click the //OK// button
-          - Note that we already have PTV dose constraints at the Fraction Group Target level, so no additional ones are needed here 
 <WRAP center round info 85%> <WRAP center round info 85%>
 After the target constraints have been entered, it's generally good practice to test the plan feasibility. The Feasibility calculation is run by clicking //calculate// at the bottom of this block. The Feasibility calculation is based solely on the constraints and it should be used to ensure there is a possible solution (plan) that can meet the specified constraints. Establishing Feasibility is often an iterative process in order to get appropriate constraints established for a particular plan. In other words, the user may need to enter a constraint, check the feasibility, then progressively tighten the constraint and check the feasibility until the plan is no longer feasible. It is recommended practice to start by obtaining a feasible plan utilizing only target constraints (and a global max constraint) then add OAR constraints as desired. Remember, using a narrow range of constraints can improve the optimizer performance and improve the resolution of the Pareto surface navigation. After the target constraints have been entered, it's generally good practice to test the plan feasibility. The Feasibility calculation is run by clicking //calculate// at the bottom of this block. The Feasibility calculation is based solely on the constraints and it should be used to ensure there is a possible solution (plan) that can meet the specified constraints. Establishing Feasibility is often an iterative process in order to get appropriate constraints established for a particular plan. In other words, the user may need to enter a constraint, check the feasibility, then progressively tighten the constraint and check the feasibility until the plan is no longer feasible. It is recommended practice to start by obtaining a feasible plan utilizing only target constraints (and a global max constraint) then add OAR constraints as desired. Remember, using a narrow range of constraints can improve the optimizer performance and improve the resolution of the Pareto surface navigation.
 </WRAP> </WRAP>
  
-      - Run the //Feasibility// by clicking the //calculate// link <WRAP center>{{ :planning:userguide:walkthroughs:pro23.png?300 |}}</WRAP>+      - Run the //Feasibility// by clicking the //calculate// link <WRAP center>{{ :planning:userguide:walkthroughs:pro23.png?400 |}}</WRAP>
         - The feasibility should return as passing, if not, please confirm your plan parameters match those shown throughout this walkthrough and try again         - The feasibility should return as passing, if not, please confirm your plan parameters match those shown throughout this walkthrough and try again
       - Now with the target constraints set, we'll continue to add our OAR's       - Now with the target constraints set, we'll continue to add our OAR's
Line 171: Line 168:
       - Run //Feasibility// as before       - Run //Feasibility// as before
         - The feasibility should return as passing again, if not, please confirm your plan parameters match those shown throughout this walkthrough and try again         - The feasibility should return as passing again, if not, please confirm your plan parameters match those shown throughout this walkthrough and try again
 +      - If the feasibility has passed click the //OK// button
  
 === Objectives and Optimizer === === Objectives and Optimizer ===
Line 177: Line 175:
         - //Objectives// are the goals that you would like to achieve and these will be the driving forces for the //Optimizer//         - //Objectives// are the goals that you would like to achieve and these will be the driving forces for the //Optimizer//
         - Expand the //Objectives / Optimizer// sub-block and then click //Edit// under the //Objectives// section         - Expand the //Objectives / Optimizer// sub-block and then click //Edit// under the //Objectives// section
-        - For this example we will use the following objectives:+        - For this example we will use the following objectives (Click the //Add structure// drop down menu to add the following)
           - The External_Body (Skin) will automatically populate           - The External_Body (Skin) will automatically populate
           - Rectum min_mean (Minimize the mean dose to the Rectum)           - Rectum min_mean (Minimize the mean dose to the Rectum)
           - Testes min_max (Minimize the maximum dose to the Testes)           - Testes min_max (Minimize the maximum dose to the Testes)
           - Left & Right Femur min_overdose 45 Gy (Minimize the amount of the structure the receives dose above 45 Gy)           - Left & Right Femur min_overdose 45 Gy (Minimize the amount of the structure the receives dose above 45 Gy)
-          - PTV min_max (Minimize the maximum dose within the PTV) {{ :planning:userguide:walkthroughs:pro_new_obj.png?400 |}}+          - PTV min_max (Minimize the maximum dose within the PTV) {{ :planning:userguide:walkthroughs:optimizer_1.jpg?nolink&400 |}}
       - Click //OK// to complete the //Objectives//       - Click //OK// to complete the //Objectives//
-      - We are now ready to run the MCO, by opening the //Navigation// sub-block and clicking the //calculate// link+      - We are now ready to run the MCO, by clicking the //calculate// link
         - This may take up to 10 minutes for this plan depending upon your available cloud services resources         - This may take up to 10 minutes for this plan depending upon your available cloud services resources
         - Keep in mind that even though this process may take some time, the planner will be able to make adjustments easily in the Navigation without running a new plan         - Keep in mind that even though this process may take some time, the planner will be able to make adjustments easily in the Navigation without running a new plan
Line 193: Line 191:
     - If you find a plan that you like, but wish to continue exploring further, you can click the //Save// button to save the current slider state and then continue exploring     - If you find a plan that you like, but wish to continue exploring further, you can click the //Save// button to save the current slider state and then continue exploring
     - You may return to the last saved state at any time by clicking the //Reset// button     - You may return to the last saved state at any time by clicking the //Reset// button
-    - The //Cancel// button will close the navigation block, reverting back to the last //Saved// state{{ :planning:userguide:walkthroughs:pro_new_navigation_sliders.png?400 |}}+    - The //Cancel// button will close the navigation block, reverting back to the last //Saved// state{{ :planning:userguide:walkthroughs:navigation_1.jpg?nolink&400 |}}
   - The plan is ready for physician review at this point   - The plan is ready for physician review at this point
     - Physicians often find it useful to Navigate the solution and explore trade-offs in real time, which can often alter the traditional physician approval process into an interactive, real-time trade-off analysis and on the spot plan approval     - Physicians often find it useful to Navigate the solution and explore trade-offs in real time, which can often alter the traditional physician approval process into an interactive, real-time trade-off analysis and on the spot plan approval
planning/userguide/walkthroughs/prostate_plan.1534444004.txt.gz · Last modified: 2021/07/29 18:25 (external edit)