This is an old revision of the document!
Table of Contents
Plan Approval
Before users are able to order blocks or boluses in the ElectronRT app the plans for those parts but be approved by a user with physician permissions. This action ensures parts are not ordered for plans that have not been properly QA'ed.
Fig. 1: Plan selection with no approvals
When a user goes to select a plan for a course for their patient they will be able to tell if the plan is approved or not plans that are green are approved while not approved plans are the standard blue. Approved plans also state the time they were approved and by which user in order to maintain integrity with the plan.
Approving a plan
In order to approve a plan a user must simply open the plan they with to approve and select the “Approve” option inside the general block.
NOTE: The option will not appear in the following situations:
- The user does not have permission to approve plans
- The plan has no valid beams/ or there un-handled errors with the existing beams
- The plan does not have valid dose
In any of these cases the general block will look as such:
Fig. 3: Approval option hidden
After logging in with an appropriate user and opening a plan that is ready for approval you should see the option available in the general block.
Fig. 4: Approval option available
After selecting to approve a plan a user must confirm their selection. They will also have a final opportunity to change the Name and/or Description for the final plan.
Fig. 5: Import Directory Input
When that is completed all users on this environment should see the plan as approved.